Most walls are almost impossible to date. However these two on opposite sides of the farm track up to Grange Head Farm (796033) have the date of construction carved into stones - 1918 & 1903 I wonder whether the same waller built both?
Councillor demands power to block County Durham solar and wind farm plans
-
A councillor has urged the Government to give local councils the power to
decide major solar and wind farm applications.
2 days ago